We’re another week in to the Fall One Room Challenge and since last week’s update a LOT has happened! And yet, nothing has been finished.

We are very much in the messy middle of this project and if I’m being honest, it feels a little frustrating to not be able to check anything off our list. Our cabinet doors arrived and they are so pretty! But they’re still not painted or attached to the cabinet. We took our ugly fluorescent light down and our new fixture arrived! But it’s not installed yet so we just have wires hanging from the ceiling. We’ve started the window and door trim and I’m loving the new look! But we still need a couple final pieces of trim to complete each one. So many things are in progress and nothing is fully complete, but it feels like we’re nearly to the top of a steep hill and once we get there, we can roll down and everything will pick up speed.
The thing we really need to do in order to reach that hill top is finish all the planking. So much is waiting on that: installing the ceiling fixture, crown molding, window and door trim, baseboards, painting, etc. The planking needs to be done first before we can tackle anything else.
The reason this step is taking so long is because we’re covering all the walls and the ceiling and there’s a lot of measuring and troubleshooting involved. None of our walls are square, we have a bay window, and there are so many tricky little cuts involved.
Just look at the photo below. Between the three windows + trim and the bay window + all the angles on the wall and ceiling, you can see its a lot of precise measuring and cutting with each board used. We’re cutting out notches, figuring out angles, finagling wonky corners – it’s a time-consuming, meticulous process.
It’s also not really a one-person process. The walls are one thing, but the ceiling is absolutely a two person job. We’re using 12 foot planks and there’s just no way for one person to be able to hold the plank in place and nail everything at the same time. So I not only need Justin to be home to keep making progress, but we need our kids to be napping or have someone else watch them in order to work. Needless to say, we’re working with small, inconsistent windows of time to get things done.
This weekend, LJ is going to visit my parents so we’ll have some extra time when Vi’s napping to hopefully finish out the rest of this planking. From there, progress is really going to pick up so I have a feeling that next week’s check-in is going to be full of finished updates! I can’t wait!
Make sure to stop by the One Room Challenge blog to check out all the other projects in progress!
2 thoughts on “One Room Challenge Week Three: Slow and Steady Progress”